NEW: 23 mW Wartsila 46TS-SG Gas Engine | Power Plant – 1 avail.

~23 MW output large‑bore gas engine, lean‑burn spark‑ignited design ideal for grid and baseload power plants; fewer units needed for high capacity. High efficiency (~51%) reduces fuel costs & emissions.

Fast response with ~2 min ramp to full load and unlimited starts/stops for grid balancing and renewables integration. Flexible operation across extreme ambient conditions.

Future‑proof tech supports potential sustainable fuels; robust two‑stage turbocharging for reliable performance. Minimal uptime/down‑time limits aid revenue and plant availability.