34 mW GE Vernova LM2500 Gas Turbine – 10 build slots avail.

Excerpt to come

34 mW GE Vernova LM2500 Gas Turbine Generator

request info call 303-809-1189 ten build slots available for late 2026

ETA new 2028-2029

The LM2500 and LM2500XPRESS are aeroderivative gas turbines with >120 million operating hours, offering high flexibility, dual-fuel capability, and >99.8% reliability. Fast start and modular design enable rapid installation and commissioning in as few as 14 days.

Advanced control systems, hydrogen-capable operation up to 75%, and low emissions technologies support varied industrial, utility, and data center applications, delivering efficient, scalable power with minimal operational downtime while accommodating high cycling and renewable grid integration.

request info call 303-809-1189 ten build slots available for late 2026


Sources: mtu.de, gevernova.com, ge.com, gevernova.com, ge.com