FOR SALE: 57 mW GE Vernova LM6000 Gas Turbine – 8 avail. now

8 new units available now51–57 mW output at up to 41% simple-cycle efficiency; 50 Hz and 60 Hz configurations both available.

5-minute start to full power at a ~50 mW/min ramp rate — outstanding dispatch flexibility for peaking, grid firming, or emergency applications.

The most field-proven aeroderivative in its class — 1,200+ units shipped, 40 million+ operating hours; 100% hydrogen-capable with no hardware modification.

FOR SALE: 37 mW GE Vernova TM2500 Gas Turbine – avail. now

New, unused unit available now — no lead-time wait; trailer-mounted and grid-ready within 30 days of contract signature.
37 mW aeroderivative output at ~40% efficiency — DLE or SAC combustor options; runs on natural gas, LPG, or liquid distillate with 50 Hz / 60 Hz flexibility.
One of the most field-proven mobile turbines available — 350+ units deployed globally across 30+ countries, with 7 million+ accumulated operating hours.

SOLD: 34 mW GE Vernova LM2500 Gas Turbine

Aeroderivative design, ~34 MW simple‑cycle output, fast start and high fuel flexibility for peaking or industrial power plants.

Proven technology with extensive global fleet and modular install options (e.g., LM2500XPRESS) for rapid site deployment and maintenance.

High reliability and efficiency, derived from CF6 aviation core with >99% availability and robust service/support ecosystem.