FOR SALE: 16.9 MW Baker Hughes NovaLT16 Gas turbine – 2 avail.

• Two new units available now — 16.9 mW each; 50 Hz and 60 Hz configurations both available for immediate discussion.

• 36.4% simple-cycle efficiency with a 35,000-hour maintenance interval — no boroscope inspections required, dramatically lowering lifecycle operating costs.

• 100% hydrogen-capable without hardware modification — also delivers up to 84% thermal efficiency in CHP configuration; 15 ppm NOx standard, 9 ppm available.