
NEW: 37 mW GE Vernova TM2500 Gas Turbine
request info call 303-809-1189 available now
The GE Vernova TM2500 is a trailer-mounted aeroderivative gas turbine generator delivering up to 37 mW at approximately 40% simple-cycle efficiency. With over 350 units deployed worldwide and more than 7 million operating hours, it is one of the most field-proven mobile power solutions available.
Its modular, containerized balance of plant can put power on the grid within 30 days of contract signature, operating on natural gas, LPG, and liquid distillate fuels across both 50 Hz and 60 Hz configurations.
Why aren’t we more specific about price/quantity/source? Most of the generators we offer are from companies that need to unload their equipment quietly, because of canceled projects or failed financing. We are only allowed to list them on the condition that we not display identifying information. If you want more details, contact us.
Core Characteristics
- Power Output: Up to 37 mW net output depending on variant and site conditions
- Fuel Type: Natural gas, LPG, and distillate liquid fuel; multi-fuel capable
- Frequency: Available in both 50 Hz and 60 Hz configurations
- Efficiency: Approximately 40% simple-cycle efficiency, exceeding most grid averages
- Heat Rate: From approximately 8,648 Btu/kWh (LHV) depending on variant
Design & Performance
- Mobile and modular: Trailer-mounted turbine with containerized balance of plant enables rapid deployment virtually anywhere
- Fuel flexibility: Operates on natural gas, LPG, and liquid distillate with no interruption when switching between fuels
- Fast installation: Full installation and commissioning achievable in under 14 days from site arrival
- Operational track record: Over 350 units deployed across more than 30 countries with 7+ million operating hours accumulated
Key Technical Specifications
| Net output | Up to 37 mW |
| Simple-cycle efficiency | ~40% |
| Net heat rate (LHV) | From ~8,648 Btu/kWh / ~9,124 kJ/kWh |
| Start time to full power | ~5 minutes |
| Installation time | Under 14 days |
| Grid-ready from contract | Within 30 days |
| Frequency | 50 Hz / 60 Hz |
| Units deployed worldwide | 350+ |
| Total operating hours | 7 million+ |
| Fuels accepted | Natural gas, LPG, distillate liquid fuel |
| Combustor options | DLE (dry low emissions) or SAC (water injected) |
| Package dimensions | 27.9 x 3.04 m footprint, 8.2 m height |
| Largest single lift (generator) | 72,000 kg |
Typical Applications
- Emergency & Rapid-Response Power — Fast-deployment generation following grid instability or natural disasters — Temporary capacity during planned or unplanned plant outages
- Remote & Off-Grid Generation — Isolated communities and island grids requiring reliable standalone power — High-altitude and extreme-climate sites where fixed infrastructure is impractical
- Baseload Bridging — Interim generation while permanent power infrastructure is built or upgraded — Scalable capacity addition as demand grows, unit by unit
Advantages
- Unmatched deployment speed — Trailer-mounted design and containerized balance of plant can have power flowing within 30 days of contract signature
- Lower emissions without water — The DLE variant eliminates water injection requirements while reducing NOx, CO, and particulate matter versus older combustion technologies
- Scalable capacity — Units can be added incrementally up to 37 mW each, allowing power capacity to grow in step with demand
Fast Power, Anywhere
Contact us to discuss configurations, availability, logistics, and pricing for this uniquely deployable aeroderivative gas turbine generator.
request info call 303-809-1189 available now





